Absence of Voltage Testing vs the Traditional Lockout/Tagout Sequence
The Step That Carries Risk The lockout/tagout sequence is well understood: identify all sources, shut down, isolate, apply locks and tags, release stored energy, and then verify that no voltage is present. Every step can be performed from outside the enclosure up until verification. To test for absence of voltage with a portable meter, qualified…